As-built drawing preparation depicting the final condition of a building as actually constructed, a required document for SLF applications.
An as-built drawing is a technical drawing showing the actual condition of a building after construction is complete, including all changes made from the original design. This document is a mandatory requirement when applying for a Certificate of Function Worthiness (SLF), as well as for future building maintenance purposes.
Our team assists with on-site re-measurement and adjusting architectural, structural, and mechanical-electrical drawings to match the actual condition of the building, carried out by experienced professionals.
Initial consultation & requirement identification
On-site building re-measurement
Original design drawing collection for comparison
Adjustment and redrafting
Actual condition compliance verification
Revision (if required)
Free, no commitment
Team Certifications
Consult about your environmental licensing needs now. Free, no commitment.
Contact Us NowFinal as-built drawing document handover