Flood elevation permit processing to determine a building ground floor elevation, keeping it safe from flooding and water pooling risks.
A flood elevation permit (izin peil banjir) sets the minimum ground floor elevation for a building based on topographic data and a region history of flooding. This permit is a prerequisite before construction begins, particularly in flood-prone urban areas such as Greater Jakarta.
Our team assists with land measurement, coordination with the local water resources/public works office, through to the issuance of the flood elevation certificate as part of your building technical documentation.
Initial consultation & requirement identification
Site survey and land elevation measurement
Topographic and flood history data collection
Application submission to the relevant agency
Data verification by the authority
Revision (if required)
Free, no commitment
Team Certifications
Consult about your environmental licensing needs now. Free, no commitment.
Contact Us NowFlood elevation certificate issuance